RFI_002Pending ReviewPriority

Smuggling Route Identification

From CPT Vega, Joint Task Force Pegasus · submitted 2026-04-28 · due 2026-05-12

RFI Lifecycle

Report Pipeline (1)

Reports answering this RFI move Draft → Pending Review → Published, with Cancelled recoverable back to Draft. Drafting a report can be associated with an RFI or stand alone (see the production cells).

AssessmentPROD_002Eastern Smuggling Routes AssessmentPublished
Draft a report for this RFI

Cell Tasking (0)

SourceExternalRequestedGEOINTAssignedGEOINT

An RFI can be tasked to several cells at once. Each cell tracks its own analyst and status, independent of the parent RFI lifecycle.

No cells tasked yet. Task a cell below.

Task another cell

Information Need

Identify primary and alternate smuggling routes used by the Marek network across the eastern border sector.

Justification

Supports interdiction planning along the eastern corridor.

Response Summary

Three primary routes identified. Alternate route via Height 412 assessed as likely backup. Full assessment in PROD_002.

Collection Detail

EEI
Primary and alternate smuggling routes; chokepoints; timing windows.
SIR
Identify route segments active during 0200-0500 window.
LTIOV
2026-05-14 12:00
MGRS
34U CV 21008 69925
Grid
CV 210 699
BE Number
--
Lat / Lon
50.53, 20.72

Citing Reporting (4)

IDTitleINTRel/CredDate
REP_002GEOINT Imagery Border Crossing Point AlphaGEOINTB22026-05-08
REP_003HUMINT Source Reporting on Sokol ActivityHUMINTC32026-05-06
REP_009GEOINT Height 412 Activity ImageryGEOINTB22026-05-03
REP_010SIGINT Geolocation Border Sector East 4SIGINTB22026-05-05

Production Log (6)

RFI routing and report production events, merged chronologically. Lines prefixed with a report id are production activity on that report.

  1. 2026-04-28 08:30CPT Vega · SubmittedCustomer submitted RFI through HWC intake.
  2. 2026-04-28 10:15CW2 Reynolds · Submitted → TriagedReviewed for completeness and intent. Validated as in scope.
  3. 2026-04-28 14:00CW2 Reynolds · Triaged → ScopedDecomposed information need. Identified primary discipline.
  4. 2026-04-28 16:45CW3 Vega · Scoped → AssignedAssigned to SSG Patel.
  5. 2026-04-29 09:00SSG Patel · Assigned → In WorkAnalyst began collection review and analytical work.
  6. 2026-05-01 14:30SSG Patel · In Work → Pending ReviewDraft product submitted to section lead for peer or chief review.

Supports PIR

P3PIR_004

Criminal Enterprise Overlap with Hybrid Warfare

How does the Marek network overlap with criminal enterprises, and what financial or logistical nodes connect the military and criminal activities?

Requestor

CPT Vega

JTF East J2

Joint Task Force Pegasus

ops@jtf-east.example.mil

DSN 314-555-0144

Answering Reports (1)

  • PublishedAssessmentPROD_002
    Eastern Smuggling Routes Assessment