Marek Inner Circle Network Mapping
From LTC Hayes, HWC S2 · submitted 2026-04-20 · due 2026-05-20
RFI Lifecycle
Report Pipeline (1)
Reports answering this RFI move Draft → Pending Review → Published, with Cancelled recoverable back to Draft. Drafting a report can be associated with an RFI or stand alone (see the production cells).
Draft a report for this RFI
Cell Tasking (2)
An RFI can be tasked to several cells at once. Each cell tracks its own analyst and status, independent of the parent RFI lifecycle.
Task another cell
Information Need
Map the inner circle of the Marek network. Identify the top ten nodes by influence, function, and connectivity.
Justification
Network targeting development for the Marek network.
Collection Detail
- EEI
- Inner-circle membership; roles; familial and financial links.
- SIR
- Identify the top five enablers and their functions.
- LTIOV
- 2026-05-16 12:00
- MGRS
- 34U CV 18800 66900
- Grid
- CV 188 669
- BE Number
- --
- Lat / Lon
- 50.48, 20.3
Citing Reporting (0)
Production Log (5)
RFI routing and report production events, merged chronologically. Lines prefixed with a report id are production activity on that report.
- 2026-04-20 08:30LTC Hayes · SubmittedCustomer submitted RFI through HWC intake.
- 2026-04-20 10:15CW2 Reynolds · Submitted → TriagedReviewed for completeness and intent. Validated as in scope.
- 2026-04-20 14:00CW2 Reynolds · Triaged → ScopedDecomposed information need. Identified primary discipline.
- 2026-04-20 16:45SFC Diaz · Scoped → AssignedAssigned to SFC Diaz.
- 2026-04-21 09:00SFC Diaz · Assigned → In WorkAnalyst began collection review and analytical work.
Supports PIR
Network Structure and Critical Nodes
What is the structure, hierarchy, and geographic distribution of the Marek network, and which nodes are critical enablers?
Requestor
LTC Hayes
1 Battalion S2
HWC S2
reynolds.m@1bn.example.mil
DSN 314-555-0101
Answering Reports (1)
- Marek Network Storyboard May 2026