Communications Pattern Shift Indicators
From CPT Owens, Brigade S2 · submitted 2026-05-02 · due 2026-05-16
RFI Lifecycle
Report Pipeline (0)
Reports answering this RFI move Draft → Pending Review → Published, with Cancelled recoverable back to Draft. Drafting a report can be associated with an RFI or stand alone (see the production cells).
Draft a report for this RFI
Cell Tasking (1)
An RFI can be tasked to several cells at once. Each cell tracks its own analyst and status, independent of the parent RFI lifecycle.
Task another cell
Information Need
Identify communications pattern shifts that historically precede Marek network kinetic activity.
Justification
Indications and warning of pending operations (PIR 3).
Collection Detail
- EEI
- Shifts in communications volume, pattern, and device usage.
- SIR
- Detect indicators of operational planning by comms change.
- LTIOV
- 2026-05-15 23:00
- MGRS
- 34U CV 18900 66950
- Grid
- CV 189 669
- BE Number
- --
- Lat / Lon
- 50.5, 20.31
Citing Reporting (1)
| ID | Title | INT | Rel/Cred | Date |
|---|---|---|---|---|
| REP_004 | SIGINT Communications Pattern Burst | SIGINT | B2 | 2026-05-04 |
Production Log (3)
RFI routing and report production events, merged chronologically. Lines prefixed with a report id are production activity on that report.
- 2026-05-02 08:30CPT Owens · SubmittedCustomer submitted RFI through HWC intake.
- 2026-05-02 10:15CW2 Reynolds · Submitted → TriagedReviewed for completeness and intent. Validated as in scope.
- 2026-05-02 14:00CW2 Reynolds · Triaged → ScopedDecomposed information need. Identified primary discipline.
Supports PIR
Indicators of Pending Operations
What indicators and warnings suggest Marek or his network is preparing for an attack, border crossing operation, or information operation?
Requestor
CPT Owens
1 Battalion S2
Brigade S2
reynolds.m@1bn.example.mil
DSN 314-555-0101