------Z --- --
102105012
RFI_009SubmittedPriority

Identification of Personnel at Safehouse Bravo

From MAJ Reynolds, 1 Battalion S2 · submitted 2026-05-07 · due 2026-05-21

RFI Lifecycle

Report Pipeline (0)

Reports answering this RFI move Draft → Pending Review → Published, with Cancelled recoverable back to Draft. Drafting a report can be associated with an RFI or stand alone (see the production cells).

No reports answer this RFI yet. Draft one below.
Draft a report for this RFI

Cell Tasking (0)

SourceExternalRequestedHUMINTAssignedUnassigned

Route to cell

An RFI can be tasked to several cells at once. Each cell tracks its own analyst and status, independent of the parent RFI lifecycle.

No cells tasked yet. Task a cell below.

Task another cell

Information Need

Identify personnel observed at Safehouse Bravo over the last 30 days. Tie to known network entities where possible.

Justification

Expands network mapping (PIR 2).

Collection Detail

EEI
Identities of personnel observed at Safehouse Bravo.
SIR
Name and characterize unknown attendees from 09-10 May meeting.
LTIOV
2026-05-19 12:00
MGRS
34U CV 19060 67490
Grid
CV 190 674
BE Number
--
Lat / Lon
50.512, 20.33

Citing Reporting (0)

No reporting cites this RFI yet.

Production Log (2)

RFI routing and report production events, merged chronologically. Lines prefixed with a report id are production activity on that report.

  1. 2026-05-07 08:30MAJ Reynolds · SubmittedCustomer submitted RFI through HWC intake.
  2. 2026-05-08 09:30CW2 Reynolds · Submitted → SubmittedAcknowledged. Will triage during next watch cycle.

Supports PIR

P1PIR_002

Network Structure and Critical Nodes

What is the structure, hierarchy, and geographic distribution of the Marek network, and which nodes are critical enablers?

Requestor

MAJ Reynolds

1 Battalion S2

1 Battalion S2

reynolds.m@1bn.example.mil

DSN 314-555-0101

Answering Reports (0)

No reports answer this RFI yet.