------Z --- --
102105012

GEOINT Cell

Draft a report first (standalone or against an RFI), then the cell brief, AI Assist, and Archive, then the cell's RFIs. Open an RFI to work its production pipeline.

Draft a reportThe GEOINT cell template: title, DTG, MGRS, BE number, executive summary, recommendation. Standalone or against an RFI. New drafts open on the report status board below.
Opens at Draft on the report status board below. Move it to Pending Review when ready.
Executive summary
AMBERAs of 2026-06-08Assessed by Cell Lead

Imagery coverage of NAI 003 (BCP Alpha) is current within 48 hours. Change detection on Safehouse Bravo in work. Risk: single-source dependency on commercial collects this week.

Saving stamps today's date and updates the S2 Update Brief inputs. Archive freezes a copy.

Report status (3)

Every report this cell authored (standalone drafts included) or that answers its RFIs, Draft through Pending Review, Published, or Cancelled.

Draft (2)

Border Crossing Point Alpha Pattern of Life

GEOINTAssessment · SSG Carter · answers RFI_004

Pattern of life product synthesizing GEOINT, CTD, and HUMINT into a single picture of activity at BCP Alpha across 14 days.

Safehouse Bravo Vehicle Recurrence Network Diagram

Hybrid WarfareNetwork Diagram · SSG Patel · answers RFI_007

Network diagram of vehicles and personnel observed at Safehouse Bravo over 30 day window. Tied to known network entities where attribution exists.

Pending Review (0)
No pending review reports.
Published (1)
PROD_002Published

Eastern Smuggling Routes Assessment

GEOINTAssessment · SSG Patel · answers RFI_002

Assessment of three primary smuggling routes and one alternate route via Height 412. Includes vehicle signatures, timing windows, and recommended GEOINT collection cueing.

Cancelled (0)
No cancelled reports.
GEOINT points of contactDirectory →
SSG CarterGEOINT/CTD Analyst
carter.s@hwc.example.milDSN 314-555-0211
CW2 NgataGEOINT Cell Lead
ngata.k@hwc.example.milDSN 314-555-0212